Infrastructure

Enterprise pfSense Edge Security, UniFi Wi-Fi 6 & Static Public IP Fibre Infrastructure Deployment

Secure your Ghana enterprise with pfSense edge security, UniFi Wi-Fi 6, & static IP fibre from Henry Wahab. Reliable IT solutions.

Infrastructure Active Deployment November 12, 2026
Enterprise pfSense Edge Security, UniFi Wi-Fi 6 & Static Public IP Fibre Infrastructure Deployment

Rootech IT Solutions LTD has been commissioned to engineer and deploy a hardened, high-availability enterprise network infrastructure for a corporate facility in Accra. Designed to support mission-critical remote operations, high-density wireless connectivity, and continuous IP surveillance monitoring, this deployment will deliver complete perimeter security and seamless overseas administrative control.

Planned Engineering & Architectural Scope:

  • Dedicated Bare-Metal Edge Firewall: Rootech will provision and harden pfSense Community Edition on a dual-gigabit Intel appliance with ZFS storage reliability, establishing strict hardware separation between public WAN ingress and internal distribution networks.
  • High-Density Wireless & PoE Switching: The architecture integrates Ubiquiti UniFi switching with a UniFi 6 Pro enterprise access point and a dedicated PoE surveillance switch to power multiple IP security cameras.
  • Out-of-Band Remote Staging: To ensure zero-downtime deployment, Rootech is implementing a cellular USB tethering staging workflow, enabling the client’s overseas IT engineering team to remotely configure custom routing tables, VPN tunnels, and internal subnet policies via AnyDesk ahead of carrier fiber activation.
  • Commercial Fibre & Static Public IP Integration: We are coordinating expedited enterprise fiber broadband provisioning with a dedicated public static IPv4 allocation, eliminating Carrier-Grade NAT (CGNAT) bottlenecks for uninterrupted site-to-site connectivity.

Expected Deliverable:
Upon completion, the facility will operate on a secure, fully documented enterprise network capable of gigabit-class throughput, isolated camera traffic handling, and uninterrupted remote management by international technical teams.


Deployment & Execution Timeline

14 Milestones

Phase 2 Carrier WAN Cutover, UniFi Wi-Fi 6 Optimization & Final Commissioning

Nov 18, 2026

Following the successful termination and throughput verification of the 100+ Mbps MTN Business Fibre circuit (Account: 0308189610), deployment has transitioned to Phase 2 final commissioning. Scope of works includes physical carrier WAN cutover into the dedicated pfSense CE edge firewall appliance, gateway and NAT routing verification, 80MHz channel width optimization on the Ubiquiti UniFi 6 Pro Access Point, and link verification for the 3-channel IP camera PoE distribution switch. Final AnyDesk remote administrative staging and system documentation handover complete the turnkey enterprise deployment under Proposal RTS-PROP-2026-088.

Broadband Activation & Wi-Fi 6 Throughput Validation (120 Mbps Verified)

Nov 17, 2026

MTN optical fibre connectivity was successfully energized and handed over to the local infrastructure. The UniFi Wi-Fi 6 access point was powered and calibrated via Gigabit PoE, achieving verified real-world throughput speeds of 120 Mbps on Fast.com across client endpoints. The system is operating with sub-millisecond local latency, and the edge gateway is now awaiting final static public IP block assignment from MTN to complete pfSense remote routing rules.

Fibre Service Activated & Circuit Provisioned — Static Public IP Subnet Allocation Pending

Nov 17, 2026

The physical MTN fibre drop and CPE routing hardware are fully deployed, terminated, and energized. Broadband carrier synchronization is officially live, with the active unlimited data profile confirmed on circuit ID 1111. The engineering team is currently awaiting the formal static public IP assignment and WAN gateway parameters from the MTN account officer to bind the edge pfSense firewall and complete the UniFi Wi-Fi 6 gateway cutover.

Fibre Cable Termination & Router Setup Complete — Awaiting Internet Link & Static IP Verification

Nov 17, 2026

Physical fibre cable laying and router hardware provisioning have been completed by the MTN field team. The system is presently waiting for upstream internet activation from the service provider, after which final static public IP configuration and connectivity validation will be executed.

MTN Deployment Crew On-Site — Access Clearance Pending

Nov 17, 2026

MTN outside-plant technicians have reported on location to execute scheduled fibre line pulling and CPE rack deployment. Physical access authorization is currently pending with site management to grant the engineering crew entry to the demarc point and infrastructure areas.

Installer Assigned for fibre installation

Nov 16, 2026

MTN Fibre installation request has been assigned to installer. Waiting for installer contact.

MTN Deployed

Nov 13, 2026

Followed up with MTN on Fibre deployment, and it has been noted that, a team has been assinged and deployment will be done today

MTN Broadband Order Confirmation and Account Creation for East Legon Site

Nov 12, 2026

MTN Fixed Broadband formally acknowledged receipt of the two hundred and ninety-nine Ghana Cedis installation and service fee under carrier order reference ABFB5318429762 registered to account Mariette. Follow-up communication with the designated MTN account representative at fifteen thirty-three hours confirmed that the subscriber account has been successfully created and has advanced to the final provisioning queue. The representative confirmed that the dedicated public static IP parameters, subnet mask, and default gateway will be officially assigned and released immediately following physical drop line termination and optical network terminal activation on-site. Rootech is monitoring the dispatch schedule to coordinate on-site access with the field installation team upon arrival.

MTN Fibre Installation Fee Payment & Carrier Activation Triggered

Nov 12, 2026

With client approval from Henry Wahab, Rootech disbursed the GH₵ 299.00 MTN Business Fibre mobilization/installation fee directly to MTN to initiate immediate carrier survey and optical drop line deployment. Carrier work order is now officially active while awaiting client finance release of the 50% project mobilization deposit (GH₵ 1,420.50).

Finance Mobilization Approval & Project Portfolio Onboarding

Nov 12, 2026

Client confirmed that their finance department is finalizing the 50% mobilization down payment (GH₵ 1,420.50) and verified Rootech's local corporate standing. Prepared NDA-safe project portfolio assets, registered project tracking metrics and ticket updates in Ocean ERP, and continued active follow-up with MTN Business Fibre pending carrier drop scheduling.

Commercial Technical Proposal & Proforma Invoice Issuance

Nov 11, 2026

Secured confirmation from MTN regarding 12-month Public Static IP allocation. Structured the two-phase Commercial Technical Proposal (RTS-PROP-2026-088) and issued the official Venta HUB Proforma Invoice (QT2110005) to Henry Wahab totaling GH₵ 2,841.00 (Tax Inclusive), specifying a 50% mobilization deposit of GH₵ 1,420.50.

Final Staging Confirmation & Expedited MTN Business Fibre Requisition

Nov 11, 2026

Received final sign-off on the staging diagram from the overseas team, confirming cellular USB tethering for initial AnyDesk access and specifying that the client will manage internal LAN IP addressing remotely. Verified active MTN fiber availability at the East Legon / Adjiringanor site (5.655667, -0.145639) and dispatched an urgent 48-hour commercial provisioning request to ppmanagement.GH@mtn.com for a Dedicated Public Static IP link.

Network Architecture Alignment & Full Node IP Mapping

Nov 11, 2026

Reviewed the overseas engineering team's updated architecture diagram confirming in-line pfSense firewall routing and static WAN IP requirements. Produced a detailed counter-diagram mapping dedicated IP allocations across all network nodes (192.168.1.2 WAN / 192.168.2.0/24 LAN isolation) and demonstrating direct PoE switch delivery.

On-Site Hardware Inspection & Initial Topology Assessment

Nov 10, 2026

Visited the client site to inspect and verify the newly procured hardware (dual-gigabit Intel Mini PC, Ubiquiti UniFi 6 Pro AP, U-POE-EU injector, Lenovo monitor, SanDisk 64GB USB, and Cat6 patch cables). Reviewed the client's preliminary network draft and advised on repositioning the pfSense Mini PC in-line between the ISP and core switch to enforce perimeter security and prevent DHCP conflicts.

Project Specifications

  • Category Infrastructure
  • Status Active Deployment
  • Client Henry Wahab
  • Initiated November 12, 2026

Need a Similar Deployment?

Our systems engineers design and deploy enterprise firewalls, UniFi networks, IP surveillance, and custom software across Ghana.

Request Technical Consultation
Shopping Cart
Your cart is empty

Browse our enterprise IT supplies, servers, POS hardware, and surveillance systems to add items to your cart.

Explore Store